​佛山市颖发塑料材料有限公司
塑料建材领导者

免费客服热线:

135 0025 4524

致力于改善屋顶,家具,装修建材
FOSHAN YINGFA PLASTIC MATERIALS CO., LTD
颖发塑料
多家上市公司瓦&板材&天花供应商
11年的PVC建材生产经验
防水环保 耐用耐酸 安装方便
免费热线

139 2854 7600

热门关键词: PVC树脂瓦 PVC发泡板 PVC集成快装板 集成快装天花   防水板材
 
颖发塑料

 新闻中心

新闻列表

  • 27 2019-09
  • 27 2019-09
  • 27 2019-09
  • 27 2019-04
  • 26 2019-09

    梯形瓦如何安装的?

    Load / Span Data
    The specified dim ensions do not supersede the requirem ents of local construction codes.
    The maximum purlin spans are based on continuous beam calculation m odel and practical testing.
    The criterion for allowed deflections is L/20.
    The mentioned load refers to both wind and snow loads.
    Minimum recommended slope–10% .


    Panel Length
    Maximum recommended panel length- 7.0 m .
    Recommended longitude overlap of 200mm above purlin.
    Each panel to extend 100mm over the fixings line on the purlin.
    Panels should overhang Min.50mm and Max.150mm beyond the last fixings line.




    Yingfa Trapezoid Roof Tile Installation Guide


    Curved Roof

    Minimum curving radius 16.0 m .



    Positioning

    Make sure the UV protected side faces out.
    Side-lap of Yingfa panels m ust be installed against the prim ary direction of rain.
    The Yingfa panels must be located and installed without any stresses.
    Do not pull, stretch or force the sheets when the profiles are not perfectly m atched.


    Fastening

    Apply sealing tape along the Side-Lap m etal panel’s corrugation crests, on both sides.
    Apply sealing tape over the side-sap Yingfa panel corrugation crests, where covered the Metal panel
    Apply sealing tape along the bottom and top End-lap (if there is), along screws centerline or two tapes
    on both sides of screw centerline.
    Pre-drill 10m m holes at crests where screws are positioned.
    Start fastening the screws from the first side-lap (left) through the pre-drilled holes (3).
    Start fastening the screws on the lower edge purlin (End-lap), at each corrugation crest (1).
    Fasten screws at the internal purlins, on every other corrugation crest, starting at the sam e side (2, 3).
    Fasten screws at the upper edge purlins, at each corrugation crest, starting at the sam e side (1, 3).
    Do not over-tighten!
    Fasten the stitching screws at every 300-400 m m (4).


    Fastening Location












    Yingfa Trapezoid Roof Tile Installation Guide


    Screws and Washers Specification

    Crest fixing: Self-drilling 5.5m m x 65mm (2.5") screw + matched m etal crest rider (Storm washers) with
    EPDM gasket.
    Side Stitching: 5.5m m x 19m m (3/4”) self-tapping screw with 19 mm washer/gasket.


    Important Notes

    Use only Yingfa approved accessories, including EPDM rubber washers, silicones,
    sealing tape, closure fixtures etc.
    For clear Yingfa onto wooden purlins, apply white acrylic paint, or aluminum tape, in
    order to prevent over-heating of the purlins.


    Cutting Tips

    Use jigsaw or circular saw with fine tooth blades.
    Apply high blade speed with m oderate feeding rate.
    Support the sheets near the cutting line.
    Clean the dust and cutting chips after cutting.


    Safety

    Do not step directly on the panel.
    Use stepping boards.
    Work according to local safety regulations.


    Handling and Storage

    Store in a dry shaded place, protect from direct sunlight and rain.
    Avoid covering the sheets with heat absorbing m aterials.
    Avoid contact or environm ent of chem icals.
    Protect the sheets from any physical dam age.

 
颖发板材,板材专家

  户外,户内

全国免费热线:

139 2854 7600

在线咨询
 
联系我们
 

13928547600

13500254524
karlinoffice@126.com
0757-81637321